-
A recent study, led by Victoria University and West Justice Youth Office, has revealed that students from low socioeconomic families cannot afford to travel on public transport, or pay the fines they incur for travelling without a valid myki card. West Justice chief executive Denis Nelthorpe said: “Up to 80,000 Victorian students a year were unable to pay fines, resulting in many of them skipping school.” -
Contractors carrying out construction works for the controversial multi-billion dollar Westconnex tollway, even before official planning approval has been given, called police on February 2 after some local residents occupied their planned drilling site in the middle of Tempe Reserve. No arrests were made during the peaceful protest, which stopped the contractors starting work after residents set up a picnic in the public space where they planned to conduct drilling. One resident also climbed the drill rig and occupied it for several hours to stop work going ahead. -
In a move designed to restrict examination and comment, the NSW government released the Environmental Impact Statement (EIS) for the New M5 in late November. The EIS was on public exhibition until January 29 — virtually the whole summer holiday period. The New M5 is the second major tunnel section of WestConnex and will run between the existing M5 East at Kingsgrove and the new interchange at St Peters.
-
When Liberal MP Jamie Briggs was in Hong Kong and was not busy making unwanted advances on public servants, he was meeting with private rail operator MTR. This aspect of his travels should also be under scrutiny. -
The Perth Freight Link (PFL) project ground to a halt on December 16 when Supreme Court Chief Justice Wayne Martin ruled environmental approvals for the Roe 8 freeway through the Beeliar Wetlands were invalid. Incredibly, the Environmental Protection Authority (EPA) had argued it was not bound by its own policy when assessing and granting approval. This result comes on top of a 2013 decision that the EPA had bungled approvals for the James Price Point gas processing facility. -
A very heavy police presence has greeted protesters who have taken a stand against test drilling in the Beeliar Wetlands at the site of the Roe 8 freeway extension.
-
Rather than reducing traffic congestion in Sydney, a report commissioned by the Leichhardt Council has found that the giant WestConnex tollway project will increase traffic problems in the city's inner west. The report, which analysed the Environmental Impact Statement (EIS) for the M4 East component of WestConnex — a tunnel from Concord to Ashfield — was released on October 20. -
The New South Wales government is preparing a fire sale of state-owned properties around the Sydney Harbour foreshore, on the pretext of funding an upgrade of the Circular Quay ferry wharves. Premier Mike Baird announced on September 28 that government-owned hotels and office buildings would be sold to raise $200 million for the renovation project. -
Community groups from across Sydney have condemned the NSW government's announcement that the community consultation period for the Environmental Impact Statement (EIS) for the M4 East section of the huge WestConnex tollway will be limited to 45 days. NSW Planning Minister Rob Stokes released the Environmental Impact Statement on September 9. NSW Greens spokesperson for WestConnex and MP for Newtown Jenny Leong said: “This is the largest, most complex road building project in Australia’s history. -
Local residents of the Sydney suburb of St Peters successful halted what they suspected was an illegal attempt to remove asbestos from the planned St Peters Interchange site in the ecologically and financially irresponsible $15 billion WestConnex road-tunnel project.
-
Many Victorians had hoped the election of a state Labor government signaled an end to the East West Link and the dawn of a new age of public transport projects, with the Andrews government committing to start building the $11 billion Metro Rail Project in 2018. Now, federal Liberal MPs from Melbourne’s outer east are trying to resuscitate the East West Link. On August 8 they held a small rally with the demand “Build the Link”. -
A new front in the battle against WestCONnex has opened up with the beginning of preparatory works at the Alexandria Landfill adjacent to Sydney Park in the inner west suburb of St Peters. The landfill was chosen last year to be the site of a WestCONnex interchange, spewing anywhere between 30,000 to 100,000 cars a day into congested inner south-west streets. Nearby residents are in uproar when they found out last week that asbestos would be removed. This is despite the Environmental Impact Statement not having been released, or approval granted, for that stage of WestCONnex.