Newcastle

Reclaim the Cove, the Fullerton Cove campaign to stop coal seam gas mining, released the statement below on September 6. * * * In a historic decision, the Fullerton Cove Residents Action Group today won an injunction to prevent Dart Energy from drilling for coal seam gas at Fullerton Cove, near Newcastle, until a full legal challenge has been heard.
Rising Tide released the statement below on September 5. * * * Activists have closed down a coal haulage railway construction project in the NSW Hunter Valley, to protest the rapid expansion of the export coal industry and its impacts on public health and the environment. Activists arrived at the Hunter 8 Alliance construction compound at Rutherford before dawn this morning, erecting a wooden tripod to prevent access to the site. An activist is perched on the tripod, 10 metres over the gateway to the site, refusing to move.
Residents of Fullerton Cove, on the outskirts of Newcastle, set up a blockade on Monday 20 August to prevent Dart Energy from drilling two coal seam gas pilot wells that are currently under construction.
The Coal Terminal Action Group hosted a public forum on August 21, with several expert speakers opposing the proposed fourth coal loader for Newcastle, known as the “T4”. Georgina Woods, senior climate campaigner with Greenpeace Australia Pacific, said T4 was not “just another coal terminal … It is part of a long process of continual expansion that will more than double coal exports with an extra 120 million tonnes and 107 extra trains per day and destroy an internationally listed wetlands.

Pages

Subscribe to Newcastle